TECHNICAL OFFICER
WINNIPEG, MB
Manitoba Hydro is consistently recognized as one of Manitoba's Top Employers!
Great Benefits
- Competitive salary and benefits package.
- Defined-benefit pension plan.
- Nine-day work cycle which normally results in every other Monday off, providing for a balanced approach to work, family life and community.
- Flex-time and partially remote work schedule (providing the option to work remotely 3 days per 2 week period), depending on nature of work, operational requirements and work location.
Manitoba Hydro is a leader among energy companies in North America, recognized for providing highly reliable service and exceptional customer satisfaction. Join our team of Manitoba's best as we continue to build a company that supports innovation, commitment, and customer service, while actively supporting a diverse, equitable and inclusive workplace.
We are seeking a permanent Technical Officer to join our System Performance Department in Winnipeg, Manitoba.
Responsibilities:
- Work closely with the Principal Network Studies Engineer to conduct operating studies focused on the U.S. interface, and provide support to studies on Ontario, Saskatchewan and Manitoba internal interconnections.
- Develop, prepare, and maintain system data and models required for use in conducting loadflow and transient stability studies to determine operating limits on the interconnected Manitoba Hydro transmission system.
- Work with SMEs in System Performance and System Protection and Controls departments to develop, prepare, maintain and document annual compliance data for the Manitoba Hydro Under Frequency Loadshed Scheme (UFLS).
- Analyze system performance under normal and contingency conditions, and prepare technical reports with recommendations for corrective actions, system improvements, control modifications, and operating guidelines.
- Lead the development, review, and issuance of daily power flow models, temporary operating instructions, and contingency plans for System Control staff and external operating entities to effectively support day-ahead and real-time operations.
- Represent Manitoba Hydro in technical discussions and data exchanges with external utilities and organizations (e.g., MISO, MRO), and coordinate the interchange of electrical system parameters to support seasonal and operational studies.
- Conduct transient disturbance simulations and assess the effectiveness of remedial actions using fault recordings. Maintain and enhance in-house systems and databases for system disturbance analysis and model validation.
- Oversee the performance and data handling of the system disturbance recording scheme, and stay current with technological developments in disturbance recording and analysis.
- Provide technical training and mentorship to junior staff, visiting engineers, and other stakeholders on power system simulation tools and study methodologies.
- Support compliance efforts by preparing, compiling, and documenting evidence for NERC standards, and contribute to external surveys and regulatory submissions (e.g., CEA, PUB).
Qualifications:
- Successful completion of a two year diploma in Electrical Technology from a recognized technical institute plus a minimum of five years directly related experience;
OR - Equivalent combination of education and experience.
- In-depth understanding of power system analysis, including loadflow and stability studies.
- Proficiency with simulation tools and data analysis software used in power system operations.
- Knowledge of interconnection standards, control systems, and protective relaying.
- Excellent communication and collaboration skills, with the ability to work effectively across departments and with external stakeholders.
- Must obtain and maintain a current Personnel Risk Assessment and a "Clear" security rating in accordance with Manitoba Hydro policy P513.
- Must have a valid Manitoba Driver's Licence.
Salary Range
Starting salary will be commensurate with qualifications and experience. The range for the classification is $43.35-$59.82 Hourly, $83,070.78-$114,625.68 Annually.
Apply Now!
Note: This employment opportunity is advertised on Manitoba Hydro's career website, and all candidates wishing to apply must do so using our online application system. Visit www.hydro.mb.ca/careers to learn more about this position and to apply online.
The deadline for applications is OCTOBER 1, 2025.
We thank you for your interest and will contact you if you are selected for an interview.
This document is available in accessible formats upon request. Please let us know if you require any accommodations during the recruitment process.
This employer accepts online applications via AMIK.ca! Apply online now for the following benefits:
- Apply online for any job on AMIK.
- Save jobs for later and track your job applications.
- Add and manage all your resume in one place.